Project: Wherwell |
 |
| Location: Wherwell, Hampshire |
| River System: River Test |
| Project type: Re-claim heavily eroded bank |
| Installation date: 2003 |
|
 |
|
 |
 |
Project: Charmouth Sewage Treatment Works (STW) |
 |
| Location: Charmouth, Dorset |
| River System: River Char |
| Project type: River bank erosion protection |
| Installation date: October 2005 |
|
 |
|
 |
 |
Project: Four Copses (phase I) |
 |
| Location: Great Wishford, Wiltshire |
| River System: River Wylye SSSI |
| Project type: Restore abstracted river channel |
| Installation date: 1998 |
|
 |
|
 |
 |
Project: Avon Lancaster II |
 |
| Location: East Chisenbury, Wiltshire |
| River System: Hampshire Avon SSSI,SAC |
| Project type: Habitat restoration in SSSI, SAC |
| Installation date: September 2005 |
|
 |
|
 |
 |
Project: Choulston Shallows |
 |
| Location: Choulston, Wiltshire |
| River System: Hampshire Avon SSSI, SAC |
| Project type: Restoration of dredged channel |
| Installation date: 2002 |
|
 |
|
 |
 |
Project: Thames Henley Management College |
 |
| Location: Henley-on-Thames |
| River System: River Thames |
| Project type: River bank erosion protection |
| Installation date: 2005 |
|
 |
|
 |
 |
Project: Lambourn Hunts Green |
 |
| Location: Hunts Green, Newbury |
| River System: Lambourn |
| Project type: River Restoration |
| Installation date: 2005 |
|
 |
|
 |
 |
Project: River Lambourn Restoration Plan |
 |
| Location: Woodspeen Mill to Newbury |
| River System: River Lambourn |
| Project type: Consultancy - Scoping Survey |
| Installation date: July 2005 |
|
 |
|
 |
 |
Project: Vitacress Bourne Rivulet |
 |
| Location: St Mary Bourne, Hampshire |
| River System: Bourne Rivulet, River Test |
| Project type: Chalkstream Restoration |
| Installation date: January to April 2007 |
|
 |
|
 |