 |
Project: Monk Bretton Bridge |
 |
| Location: Rye, East Sussex |
| Tidal System: Rother inter-tidal |
| Project type: Erosion Control (design/build) |
| Installation date: 2004 |
|
 |
|
 |
 |
Project: Scotts Float |
 |
| Location: Rye, East Sussex |
| Tidal System: River Rother |
| Project type: Tidal flood defence (design/build) |
| Installation date: 2005 |
|
 |
|
 |
 |
Project: Military Road |
 |
| Location: Rye, East Sussex |
| Tidal System: Rother inter-tidal |
| Project type: Erosion Control (design/build) |
| Installation date: July 2005 |
|
 |
|
 |
 |
Project: Bleadon STW |
 |
| Location: Bleadon Sewage Treatment Works |
| Tidal System: River Axe |
| Project type: Erosion Control (design/build) |
| Installation date: May 2006 |
|
 |
|
 |