Case Studies - Canals

Although most of the work that Cain Bio-Engineering Ltd undertakes is designed specifically for each location, we have produced a suite of generic designs for canals.
 
The problems of bank damage by boats and anglers is commonplace and the environment similar in most locations



Extensive work with British Waterways over a number of years has led to the production of a series of in-house designed solutions that counter most erosion and public safety issues encountered on canals whilst improving appearance and biodiversity.

In 2006 Cain Bio-Engineering Ltd. launched its Cain Type II designs. This suite of designs provides shorter project programme durations and lower costs whilst refining our previous designs that have been proven over the last ten years.

 

2 months later - project site showing sinuous, re-profiled channel with flood berms and pond.Project: Thames Canal Junction 


Project Type : New Canal Construction

Project Location: Abingdon

Canal System: River Thames (Wilts & Berks Canal)

Date of Installation: August 2006

 
 



Project: Moulton Drive


Project Type: Erosion Control

Project Location: Bradford-on-Avon

Canal System: Kennet and Avon Canal

Date of Installation: 2000


 
 

 

Project: Tyle Mill


Project Type: Erosion Control

Project Location: Tyle Mill - Newbury

Canal System: Kennet and Avon Canal

Date of Installation: July 2007
  







Project: Pewsey Wharf


Project Type: Towpath Erosion Control

Project Location: Pewsey, Wiltshire

Canal System: Kennet and Avon Canal

Date of Installation: January 2009



 

 

Project: Kennet Emcor 


Project Type : Signal Crayfish Damage Repair

Project Location: Woolhampton

Canal System: Kennet and Avon Navigation

Date of Installation: February 2009

 
 


 

Project: Pewsey Bank Slips 


Project Type : Bank Repair

Project Location: Pewsey Wharf

Canal System: Kennet and Avon Canal

Date of Installation: May 2009