Skip Navigation Links » Home » Case Studies » Urban » Summerlock Stream

Project details:
 

   
   

 

Project Brief

 
Re-claim the eroded, over-widened flood channel

Provide a long-term bank protection solution.

Enhance public access to the river

Enhance the in-stream and marginal biodiversity of the SSSI,SAC

Enhance the aesthetic appeal of the site                                                                     
 
 

Solution


Cain Bio-Engineering successfully delivered this project by enveloping sustainable coppiced products with engineering geotextiles.

By reinforcing the structures in this way, a high level of public access was acheived without compromising the remaining project objectives.
 


 

  ""The works have been extremely well received by the general public. Cain Bio-Engineering Ltd has proved to be extremely professional, knowledgeable and efficient"

R.W. SDC Parks Department
 

 

Associated Downloads

 
 Engineered or not? - A case study  of Summerlock Stream Salisbury  
   
   

Case Study: Summerlock Stream

Project : Erosion Control
Project Location: Salisbury City Centre
River System: Avon SSSI, SAC
Client: 

Date of Installation:
2000